ESAB ESP-50 Instrukcja Naprawy Strona 8

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
Przeglądanie stron 7
234
6.4 SEQUENCE OF OPERATION
NOTES:
1. When the start signal is turned "on" during postow period, the postow and preow times are canceled.
2. When the amber fault light comes on, cutting operation should be stopped. The postow time starts from the moment
the start signal is removed.
10 SEC
.5 SEC.
START SIGNAL
GAS SOLENOID VALVE
OPEN
CLOSE
PREFLOW
OFFON
FAULT OVERLOAD LIGHT
INVERTER
CUTTING ARC (CURRENT)
POSTFLOW
SECTION 6 TROUBLESHOOTING
NOTE:
Schematics and Wiring Diagrams on 11” x 17”
paper are included
inside the back cover of this manual.
Przeglądanie stron 7
1 2 3 4 5 6 7 8 9 10 11 12 13 ... 23 24

Komentarze do niniejszej Instrukcji

Brak uwag