ESAB ESP-50 Instrukcja Naprawy Strona 7

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
Przeglądanie stron 6
233
6.3 REFERENCE VOLTAGE CHECKS
A. Control Board Assembly (PCB1)
1. LED’s
LED-1 - Torch Switch
LED-3 - Gas Solenoid Valve
2. Voltage Test Points
Tests are made with power on - no arc.
TP-0 - Ground
TP-1 - +15 vdc
TP-2 - +12 vdc
TP-3 - -12 vdc
TP-4 - +5 vdc
TP-9 - IGBTs driving signal - switching frequency = 20 KHz
TP-10 - IGBTs driving signal - switching frequency = 20 KHz
For 208/230 VAC input, the IGBT o time is 3µsec.
For 400/460 VAC input, the IGBT o time is 3µsec.
Figure 6.1 IGBT Gating Signal
SECTION 6 TROUBLESHOOTING
33
SECTION 5 TROUBLESHOOTING
5.3 REFERENCE VOLTAGE CHECKS
A. Control Board Assembly (PCB1)
1. LED’s
LED-1 - Torch Switch
LED-3 - Gas Solenoid Valve
2. Voltage Test Points
Tests are made with power on - no arc.
TP-0 - Ground
TP-1 - +15 vdc
TP-2 - +12 vdc
TP-3 - -12 vdc
TP-4 - +5 vdc
TP-9 - IGBT’s driving signal - switching frequency = 20 KHz
TP-10 - IGBT’s driving signal - switching frequency = 20 KHz
For 208/230 VAC input, the IGBT off time is 3µsec.
For 400/460 VAC input, the IGBT off time is 3µsec.
Figure 5.1 IGBT Gating Signal
50µsec
0
-13 vdc
13 vdc
40 usec - LPG50
50 usec - LPG80
6 usec - LPG50
9 usec - LPG80
Przeglądanie stron 6
1 2 3 4 5 6 7 8 9 10 11 12 ... 23 24

Komentarze do niniejszej Instrukcji

Brak uwag